
Home | Accounts
& Reports | Admin Hearings |
Budget | Facilities
| DISC | Personnel
| Purchases | Printing
| Surplus
|
Facilities PlanningThe following advertisements are duplicates of the official advertisements in the Kansas Register, which can be viewed at http://www.kssos.org/pubs/pubs_kansas_register.asp. Capital Improvement Project Advertisements and State Building Advisory Commission Public Hearing Announcements Unless otherwise noted, the following requirements are common to all advertisements. To be considered, five (5) bound proposals and one pdf file on a CD of the following should be provided: a letter of interest, an SF330 Part I, information regarding similar projects, and an SF330 Part II for each firm and consultant. Proposals should be concise and follow the July 1, 2008 State Building Advisory Commission guidelines, available to firms on http://www.da.ks.gov/fp/. If copies of the guidelines are needed, contact Phyllis Fast, Division of Facilities Management, 900 SW Jackson, Suite 102, Landon State Office Building, Topeka, Kansas 66612, telephone (785) 296-5796, Phyllis.Fast@da.ks.gov. For July 1, 2008 State Building Advisory Commission guidelines (Building Design Construction Manual, Chapter 4, Sections 4 and 5) click here (pdf). All proposers should notify Phyllis.Fast@da.ks.gov of the means of delivery (via a delivery service, U. S. mail, or hand-carried by an individual) whenever a proposal is sent to DFM. [The e-mail may also include the pdf file of your proposal, thus eliminating the need to send DFM a CD of the pdf file.] As a result of your e-mail to DFM, a response with the dates of the SBAC nominations will be given. These procedures are being made in an effort to improve communications regarding capital improvement projects and to make the process more efficient. Construction Management At-Risk Services (the above requirements do not apply) Notice is hereby given of the commencement of negotiations for Construction Management At-Risk Services for the construction of a new School of Pharmacy building on the University of Kansas, West Campus area in Lawrence. The construction manager will provide at a minimum the following services: pre-construction budgeting, cost estimating, scheduling, constructability reviews and value engineering studies; divide the project into scopes of work for bidding, pre-qualify subcontractors, and take bids for the work; review bids with the design team and Owner to determine bids to accept, prepare cost estimates for the unbid portions and provide a guaranteed maximum price and a bond; manage construction and track all costs for the design team and Owner’s review. Estimated construction cost is $31,395,000. Total building area is approximately 111,700 SF. General areas of concern include identification and management of multiple bid packages on an accelerated phased schedule, effective management of construction costs, successfully addressing the Owner’s project needs and goals, and completion of construction for occupancy by the Owner not later than November 2010, and preferably by August 2010. The Construction Manager’s role will be critical in identifying the means, methods and other provisions that will be required to allow this project to be constructed on time and within budget. Architectural programs and additional information concerning the scope of services are available from Jim Modig, Director, KU Office of Design and Construction Management, telephone (785) 864-3433 or e-mail jmodig@ku.edu. To be considered, five (5) bound statements of qualifications and one (1) pdf file on a CD of the following should be provided: a letter of interest, an SF330 Part I, information regarding similar projects, experience in this type of project delivery system, references from design professionals and owners from previous projects, description of the construction manager or general contractor project management approach, financial statements, bonding capacity including capability of providing a public works bond (K.S.A. 60-1111) and evidence of such bonding capacity (note: failure to present such bonding evidence will deem the firm as unqualified for selection), and an SF330 Part II for each firm. Proposals should be concise and follow the current State Building Advisory Commission guidelines, available to firms at http://da.ks.gov/fp/ (chapter 4 of the BDCM). If additional information is needed, contact Phyllis Fast, Division of Facilities Management, 900 SW Jackson, Suite 102, Landon State Office Building, Topeka, Kansas 66612, telephone (785) 296-5796, Phyllis.Fast@da.ks.gov. Submittals should be received by Ms. Fast, on or before noon, October 24, 2008. The official advertisement can be viewed in the October 9, 2008 Kansas Register. Architectural services are being requested for a new industry building at Lansing Correctional Facility, Lansing, Kansas. The anticipated scope of work for the projects is as follows:
Estimated constructed cost for this project is $1,500,000. For more information concerning the scope of services, contact Michael E. Gaito, telephone (785) 296-0883. Submittals should be received by Ms. Fast, on or before noon, October 10, 2008. The official advertisement can be viewed in the September 25, 2008 Kansas Register. SBAC A/E Firm [Nominations] Selection KSU Bramlage/Stadium Renovation: HOK KUMC OnCall Architectural Services: [Spangenberg Phillips, Tevis Architects, McCluggage VanSickle Perry, Sabatini, Howard Helmer, HMN, Ellerbe Beckett, BNIM, Junk, Wilson Darnell Mann] SBAC CM At-Risk/Design Build Services [Nominations] Selection ESU Union Addition/Renovation CM At-Risk Services [October nominations] LCF KCI Warehouse Facilities [November nominations] KU Pharmacy CM At-Risk Services [November nominations]
|